7–8 Jun 2022
HZB Adlershof
Europe/Berlin timezone

Development of a new BPM electronic system for the PETRA pre-accelerator chain

8 Jun 2022, 11:00
30m
Room 14.51 - 3147 (next to reception) (HZB Adlershof)

Room 14.51 - 3147 (next to reception)

HZB Adlershof

Albert-Einstein-Strasse 15 12489 Berlin

Speaker

Hans-Thomas Duhme

Description

There is a large range of bandwidth needed for the BPM electronics for
the Petra pre-accelerators. The bunch length willl vary from the ns to
ps range. Also a new bunch burst mode is request for the Petra IV first
turn operation. The new BPM electronics is developed as a universal peak
detector hardware in a mtca.4 environment. Automatic adjusted delay
lines or 2x2 cross point switch technique will be tested for self
calibration. The goal is a universal mtca.4 based electronics for button
BPMs. The limitation of this detector electronic is the bunch spacing of
at least 100ns.

Primary authors

Presentation materials